This picture taken on January 20, 2023 shows the storage tanks for contaminated water at the Tokyo Electric Power Company’s (TEPCO) Fukushima Daiichi nuclear power plant, in Okuma of Fukushima prefecture. (Phiti by Philip Fong / AFP)

Japan to start Fukushima water release as early as late Aug

Japan plans to start releasing treated radioactive water from the tsunami-wrecked Fukushima nuclear power plant into the ocean as early as late August, Japan’s Asahi Shimbun daily reported on Monday,…

Read More
A seagull eats a fish thrown away by fishermen after it was damaged with a net and couldn’t be sold, at Tsurishihama fishing port in Shinchimachi, about 55 km away from the disabled Fukushima Dai-ichi nuclear power plant, in Fukushima Prefecture, Japan, March 1, 2023. REUTERS/Kim Kyung-Hoon/File Photo

How Japan plans to release Fukushima water into the ocean

Japan is set to begin pumping out more than a million tonnes of treated water from the destroyed Fukushima Daiichi nuclear power plant this summer, a process that will take decades to complete. The water was distilled after…

Read More

Page 1 of 1

Login

Welcome! Login in to your account

Remember me Lost your password?

Lost Password